0x000a0001 CAPABILITY_DIAGNOSTIC_LID_OPEN
This alarm is covered by this guide. Applicable alarms (3)
Likely outcomes — click to expand
Based on 0 missions where this alarm fired in the last
90 days
(for 0x000a0001) as of 2026-10-13
Aggregated from fleet operations and refreshed daily. Individual outcomes may vary by site and configuration.
Troubleshooting Steps
Section titled “Troubleshooting Steps”graph TD
did-the-alarm-occur-during-a-dlb{"<small><b>Step 1</b></small><br/>Question: Did the alarm occur during a Droid Le..."}
complete-the-dlb-work-orders["<small><b>Step 2</b></small><br/>Action: Complete the work orders listed below..."]
close-the-lid["<small><b>Step 3</b></small><br/>Action: Close the lid."]
power-cycle-the-droid-for-steps-see["<small><b>Step 4</b></small><br/>Action: Power cycle the Droid. For steps, see..."]
wait-for-the-droid-to-fully-boot-bac["<small><b>Step 5</b></small><br/>Action: Wait for the Droid to fully boot back..."]
if-the-issue-is-not-resolved-escalat{{"<small><b>Step 6</b></small><br/>Escalation: If the issue is not resolved, escalat..."}}
did-the-alarm-occur-during-a-dlb -->|Yes| complete-the-dlb-work-orders
did-the-alarm-occur-during-a-dlb -->|No| close-the-lid
close-the-lid --> power-cycle-the-droid-for-steps-see
power-cycle-the-droid-for-steps-see --> wait-for-the-droid-to-fully-boot-bac
wait-for-the-droid-to-fully-boot-bac --> if-the-issue-is-not-resolved-escalat
style did-the-alarm-occur-during-a-dlb fill:#dbeafe,stroke:#3b82f6,color:#1e3a5f
style complete-the-dlb-work-orders fill:#dcfce7,stroke:#22c55e,color:#14532d
style close-the-lid fill:#dcfce7,stroke:#22c55e,color:#14532d
style power-cycle-the-droid-for-steps-see fill:#dcfce7,stroke:#22c55e,color:#14532d
style wait-for-the-droid-to-fully-boot-bac fill:#dcfce7,stroke:#22c55e,color:#14532d
style if-the-issue-is-not-resolved-escalat fill:#fef3c7,stroke:#f59e0b,color:#78350f Hover or focus a block to preview it. Select the block to keep the preview open.
- Aircraft: Complete the work order for the relevant aircraft version:
- EV2: #195: Inspect Aircraft after Droid Left Behind (DLB)
- EV3: #662: Inspect Aircraft after Droid Left Behind (DLB)
- Droid: Complete the following work orders in order:
1. #1169: Reset Droid after DLB
2. #1196: Offload Droid Logs after DLB
3. #1302: Perform Droid GNSS Status Test after DLB
Resolution note
This plaintext block is ready to paste into the Resolution Note field on the ZERP issue you're working. The permalink below gives engineering review access to the full step-by-step timeline including any back-navigation; share it if the case needs a deeper look.
Permalink:
Session is too large to fit in a URL. Use Download session JSON to share the timeline out-of-band.
Did this guide help you get unblocked?
Open suggestions
There are no open suggestions.
Open pull requests
There are no open pull requests.