REEFING_CUTTER_DEPLOYED
This alarm is covered by this guide. Applicable alarms (1)
Likely outcomes — click to expand
Based on 24 missions where this alarm fired in the last 90 days as of 2026-10-13
Grounding vs discrepancy (of 24 ZERP issues filed on these missions)
Frequently co-occurring alarms (% of the 24 missions above)
Aggregated from fleet operations and refreshed daily. Individual outcomes may vary by site and configuration.
Background
Section titled “Background”The reefing cutter squib has deployed, likely as part of a paraland event.
Troubleshooting Steps
Section titled “Troubleshooting Steps”graph TD
has-the-aircraft-paralanded-refer-to-h{"<small><b>Step 1</b></small><br/>Question: Has the aircraft paralanded? Refer to..."}
inspect-the-primary-structure-is-this-v{"<small><b>Step 2</b></small><br/>Question: Inspect the primary structure. Is thi..."}
replace-the-paraland-tube-for-steps-see["<small><b>Step 3</b></small><br/>Action: Replace the paraland Tube. For steps,..."]
update-the-location-to-the-applicable-l["<small><b>Step 4</b></small><br/>Action: Update the location to the applicable..."]
replace-paraland-tube-for-steps-see-umm["<small><b>Step 5</b></small><br/>Action: Replace paraland tube. For steps, see..."]
has-the-aircraft-paralanded-refer-to-h -->|Yes| inspect-the-primary-structure-is-this-v
has-the-aircraft-paralanded-refer-to-h -->|No| replace-paraland-tube-for-steps-see-umm
inspect-the-primary-structure-is-this-v -->|Yes| replace-the-paraland-tube-for-steps-see
inspect-the-primary-structure-is-this-v -->|No| update-the-location-to-the-applicable-l
style has-the-aircraft-paralanded-refer-to-h fill:#dbeafe,stroke:#3b82f6,color:#1e3a5f
style inspect-the-primary-structure-is-this-v fill:#dbeafe,stroke:#3b82f6,color:#1e3a5f
style replace-the-paraland-tube-for-steps-see fill:#dcfce7,stroke:#22c55e,color:#14532d
style update-the-location-to-the-applicable-l fill:#dcfce7,stroke:#22c55e,color:#14532d
style replace-paraland-tube-for-steps-see-umm fill:#dcfce7,stroke:#22c55e,color:#14532d Hover or focus a block to preview it. Select the block to keep the preview open.
- UMM: Remove Paraland Tube
- UMM: Install Paraland Tube
- UMM: Remove Paraland Tube
- UMM: Install Paraland Tube
Resolution note
This plaintext block is ready to paste into the Resolution Note field on the ZERP issue you're working. The permalink below gives engineering review access to the full step-by-step timeline including any back-navigation; share it if the case needs a deeper look.
Permalink:
Session is too large to fit in a URL. Use Download session JSON to share the timeline out-of-band.
Did this guide help you get unblocked?
Open suggestions
There are no open suggestions.
Open pull requests
There are no open pull requests.