This is a temporary test fixture for the telemetry-step feature described in planning/telemetry-step-feature.md. It exercises the type: "telemetry" step end to end: the technician enters a mission identifier, and the bound winch_temperature_check plot renders inline. Delete this topic once the feature has a real home.

1 telemetry
Apply the winch_temperature_check template to the failing mission. The plot below shows the winch board temperature against the ambient-temperature threshold over the mission. If the maximum board temperature stays under the threshold, the validator failure is spurious.

Paste the mission identifier from the alarm report. The winch_temperature_check plot loads in place below.

Enter the mission identifier above to load the plot.

Did this guide help you get unblocked?