Skip to content

Power ON Aircraft

published HW: EV2HW: EV3

See UMM 14.1.4.c Power On Zip Using Fleet Wrangler.

See UMM 14.4.1.d Power On Zip Using Smart Cart.

  1. SSH into the Dock (SSH into Dock).
  2. Run: /dock/bin/charger_commander -w WAKEUP.

Power ON Aircraft Using Manufacturing Smart Cart

Section titled “Power ON Aircraft Using Manufacturing Smart Cart”
1 action
Check that the fin cap is fully seated to the docking fin and that the cart is on.

Did this guide help you get unblocked?

Open suggestions

There are no open suggestions.

Open pull requests

There are no open pull requests.