Background
Section titled “Background”May be temporary and is not critical.
Troubleshooting Steps
Section titled “Troubleshooting Steps”graph TD
did-the-alarm-occur-during-a-dlb{"<small><b>Step 1</b></small><br/>Question: Did the alarm occur during a Droid Le..."}
complete-the-dlb-work-orders["<small><b>Step 2</b></small><br/>Action: Complete the work orders listed below..."]
power-cycle-droid("<small><b>Step 3</b></small><br/>Reference: Power Cycle Droid/procedures/power...")
wait-for-the-droid-to-fully-boot-back-up["<small><b>Step 4</b></small><br/>Action: Wait for the Droid to fully boot back..."]
did-the-alarm-occur-during-a-dlb -->|Yes| complete-the-dlb-work-orders
did-the-alarm-occur-during-a-dlb -->|No| power-cycle-droid
power-cycle-droid --> wait-for-the-droid-to-fully-boot-back-up
style did-the-alarm-occur-during-a-dlb fill:#dbeafe,stroke:#3b82f6,color:#1e3a5f
style complete-the-dlb-work-orders fill:#dcfce7,stroke:#22c55e,color:#14532d
style power-cycle-droid fill:#f3e8ff,stroke:#a855f7,color:#581c87
style wait-for-the-droid-to-fully-boot-back-up fill:#dcfce7,stroke:#22c55e,color:#14532d Hover or focus a block to preview it. Select the block to keep the preview open.
• Aircraft: Complete the work order for the relevant aircraft version:
- EV2: #195: Inspect Aircraft after Droid Left Behind (DLB)
- EV3: #662: Inspect Aircraft after Droid Left Behind (DLB)
• Droid: Complete the following work orders in order:
1. #1169: Reset Droid after DLB
2. #1196: Offload Droid Logs after DLB
3. #1305: Perform Droid WiFi Test after DLB
Resolution note
This plaintext block is ready to paste into the Resolution Note field on the ZERP issue you're working. The permalink below gives engineering review access to the full step-by-step timeline including any back-navigation; share it if the case needs a deeper look.
Permalink:
Session is too large to fit in a URL. Use Download session JSON to share the timeline out-of-band.
Did this guide help you get unblocked?
Open suggestions
Open pull requests
There are no open pull requests.